Overview
Our client, a boxing class gym operator, intends to construct a mezzanine level within the existing facility. The purpose of this addition is to expand the available training area and accommodate new gym equipment. The proposed structure consists of a concrete slab foundation and a steel frame with bolted connections.
Our Approach